Ceiling Unit Rinnova 2.0 by Innova for air renewal and purification, with an air flow rate of 500 m3/h, equipped with BLDC inverter fans, BLDC compressor, (integrated) air quality probe and filters ePM1 80%.
€2,944.00
Order now and receive between 7 October and 14 October
Vertical wall mounted column Rinnova 2.0 by Innova for air renewal and purification, with an air flow rate of 300 m3/h, equipped with BLDC inverter fans, BLDC compressor, (integrated) air quality probe and filters ePM1 80%.
€2,867.00
Order now and receive between 7 October and 14 October
Heat recovery unit (without heater) DucoBox Energy Premium 325 1ZS, the new unit for controlled mechanical ventilation (CMV), with an air flow rate of 325 m3/h and 1-zone regulation.
€2,162.00
Order now and receive between 26 September and 7 October
Heat recovery unit (with heater) DucoBox Energy Premium 325 1ZH, the new unit for controlled mechanical ventilation (CMV), with an air flow rate of 325 m3/h and 1-zone regulation.
€2,273.00
Order now and receive between 26 September and 7 October
Heat recovery unit (without heater) DucoBox Energy Premium 325 2ZS, the new unit for controlled mechanical ventilation (CMV), with an air flow rate of 325 m3/h and 2-zone regulation.
€2,494.00
Order now and receive between 26 September and 7 October
Heat recovery unit (with heater) DucoBox Energy Premium 325 2ZH, the new unit for controlled mechanical ventilation (CMV), with an air flow rate of 325 m3/h and 2-zone regulation.
€2,605.00
Order now and receive between 26 September and 7 October
Heat recovery unit (without heater) DucoBox Energy Premium 400 1ZS, the new unit for controlled mechanical ventilation (CMV), with an air flow rate of 400 m3/h and 1-zone regulation.
€2,439.00
Order now and receive between 26 September and 7 October
Heat recovery unit (with heater) DucoBox Energy Premium 400 1ZH, the new unit for controlled mechanical ventilation (CMV), with an air flow rate of 400 m3/h and 1-zone regulation.
€2,550.00
Order now and receive between 26 September and 7 October
Heat recovery unit (without heater) DucoBox Energy Premium 400 2ZS, the new unit for controlled mechanical ventilation (CMV), with an air flow rate of 400 m3/h and 2-zone regulation.
€2,771.00
Order now and receive between 26 September and 7 October
Heat recovery unit (with heater) DucoBox Energy Premium 400 2ZH, the new unit for controlled mechanical ventilation (CMV), with an air flow rate of 400 m3/h and 2-zone regulation.
€2,882.00
Order now and receive between 26 September and 7 October
EKAFV100F6 filter for Daikin VAM-FC heat recovery units, from size 1000 to 2000, with F6 filtration efficiency. The 1500 and 2000 sizes require 2 filters.
€92.00
Order now and receive between 26 September and 7 October
EKAFV100F7 filter for Daikin VAM-FC heat recovery units, from size 1000 to 2000, with F7 filtration efficiency. The 1500 and 2000 sizes require 2 filters.
€99.00
Order now and receive between 26 September and 7 October
EKAFV100F8 filter for Daikin VAM-FC heat recovery units, from size 1000 to 2000, with F8 filtration efficiency. The 1500 and 2000 sizes require 2 filters.
€103.00
Order now and receive between 26 September and 7 October